Haomei Machinery > Haomei News > Views
Don't Forget To Draining Of Material Stock Before Transfer Batch Plant
Writer:Admin Time:16/03/14We are manufacturers, has 10 years of experience central mix concrete batch plant so you can directly tell you about mixing station using the key.Below about the concrete mixing station after the outage notice:
1, after the operation, you should clean the mixing tube, and a discharge hopper door, and washed with water, while the additional rinse agent supply system. Knife weighing system, that cuts should be cleaned, and should ensure weighing accuracy.
2, freezing season, the pump should be exhausted, additional coolant pump, water tanks and water storage tank additives, and should start the batch plant and additive pump runs twelve minutes.
3, when mixing station transfer or outage, water tank should be, admixture, cement, sand, stone material within the storage hopper and weighing hopper net, and clean.Balance of transfer should be leveraged header tuo fixed, sensor should be unloaded.
I hope this batching machine downtime related considerations instructions can help your business.